Staff recruitment material
"New Stamford House" leaflet
Leaflet for staff summarising the planned changes to Stamford House (the main building of Sainsbury's 'Blackfriars' head office and depot complex in London).
The relocation of the depot from Stamford House to Charlton allowed the company "room at last to develop and improve our offices in Stamford...
Read all
The relocation of the depot from Stamford House to Charlton allowed the company "room at last to develop and improve our offices in Stamford...
- Ref. No: SA/EMP/1/6/3
- Format: Printed Material
- Date: [c. 1971]
- Level: Item
- Extent: 1 item
- Access: Open
2
Leaflet for staff summarising the planned changes to Stamford House (the main building of Sainsbury's 'Blackfriars' head office and depot complex in London).
The relocation of the depot from Stamford House to Charlton allowed the company "room at last to develop and improve our offices in Stamford House". As part of the scheme the interior was redesigned, new facilities and offices were developed including a new staff restaurant, and the 6th and 7th floors were to be demolished and reconstructed.
The leaflet includes drawings of the proposed reception and restaurant, a basic cut through section plan, and a schedule of planned office and facilities moves.
The relocation of the depot from Stamford House to Charlton allowed the company "room at last to develop and improve our offices in Stamford House". As part of the scheme the interior was redesigned, new facilities and offices were developed including a new staff restaurant, and the 6th and 7th floors were to be demolished and reconstructed.
The leaflet includes drawings of the proposed reception and restaurant, a basic cut through section plan, and a schedule of planned office and facilities moves.
Related memories
Do you have an image that relates to this record? Add your personal
touch. If you worked for Sainsbury’s, please provide brief career details
and include dates where appropriate.
Share your memories
Comments
Comments (0)